Frame and tray level
Frame and tray set perfectly flat so water drains fully

Farwaniya
Shower cabin installation in Ardhiya Industrial requires understanding modern building structure and ensuring the floor is level before the frame goes down. We position the cabin precisely, test the drain and seal every edge with waterproof sealant before handover. We handle supply and waste pipes in industrial facilities where layouts differ from residential buildings.
In Ardhiya Industrial buildings, most bathrooms sit at outer corners or against load-bearing walls, which means the drain run may need to cut through thick concrete slab. We chase channels in the concrete to route pipes toward the main floor trap, then secure the cabin frame with heavy metal brackets to the walls. A steady fall from the cabin to the trap is essential for quick drainage and to check that water does not pool under the slab.
Ardhiya Industrial sits in Farwaniya governorate, a zone of factory and warehouse buildings with flat roofs and thick concrete floors.
We test the drain by running hot and cold water together to check flow and seals under actual load.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the concrete wall is thick enough and has a solid foundation. We use heavy expansion bolts in deep-drilled holes, then check the frame has no movement by pulling on the weight.
We cut sloped chases in the concrete with steady fall and run the pipe with short supports every metre to hold it steady. After covering the pipe we fill the chase with waterproof concrete mortar mix.
