Wall position check
Marking the correct height and anchor points before any drilling

Farwaniya
Wall-hung basin fitting in Khitan Al-Jadida starts by routing pipes up the wall to avoid moisture pooling in modern flat buildings. We set the basin height, bolt the bracket to the load-bearing stud, connect hot and cold lines, tie waste to the vertical stack and test every joint before handover.
Flats in Khitan Al-Jadida have thick concrete walls but old plumbing leaves tight gaps behind tiles. We find a safe position for the basin bracket so the bolts bite solid concrete, not hollow space. Then we run copper or plastic pipes up from the floor to the basin and bend the waste with steady fall toward the trap or stack, clearing dust and chips before retiling.
Khitan Al-Jadida in Farwaniya governorate is a modern residential zone of compact family flats and narrow bathrooms where a wall-hung basin saves floor space.
Each bracket mounting hole is drilled, not hammered, because striking concrete risks cracking adjacent tiles.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but the new wall must be checked for a concrete load-bearing stud at the bracket position. If the wall is non-load-bearing partition only, the basin bracket will sag and fail under weight and repeated use.
Core work from measuring to full bracket fit and testing is roughly three to four hours with no delays. If new channels must be cut in walls for pipe runs the time extends by an extra hour.
