Wall position check
Marking the correct height and anchor points before any drilling

Farwaniya
Installing a wall-hung basin in Farwaniya starts by locating bracket positions on walls in modern high-density housing. We run pipes from rooftop tanks and test pressure and drainage before final handover.
Apartment blocks near Farwaniya Co-op have stacked flats with matching reinforced-concrete walls. Vertical hot and cold lines run inside the building walls and branch to each unit, so connecting a new basin is usually direct. Waste normally slopes to a ground trap in the main bathroom or to a shared vertical stack leading to underground drains. We check the existing drain capacity before linking in, because new waste affects toilet and sewer flow.
Farwaniya is a densely populated district in Farwaniya governorate dominated by multi-storey apartment blocks.
We test the new waste slope by pouring water and dye to trace flow from the connection point to the shared vertical stack.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the existing lines are close to where the basin will sit. We carefully open the wall to find them and tap a side outlet at the best point without breaking the main pipe.
No if the existing drain is sized properly. We check existing pipe diameters first, and if they are marginal we may require drain upgrade before adding new load.
