Wall position check
Marking the correct height and anchor points before any drilling

Jahra
A wall-hung basin in Rawdhatain requires checking wall type first because some houses have brick walls while others are concrete. We tap lightly to identify the material, then select matching bolts and anchors, run the pipes and pressure-test before handing over.
Rawdhatain is an older residential area near the Rawdhatain natural springs and has a mix of brick, lightweight block and concrete construction. Brick walls are weaker than concrete and need expansion anchors rather than long bolts. We test the wall at a small point first before marking the four main bore points and use a damp pad to avoid heavy brick dust.
Rawdhatain lies in Jahra governorate near the protected Rawdhatain springs reserve, an older residential area with walls of varied materials.
We scan every wall type before drilling because mistakes in material identification lead to fixture failure.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Expansion anchors in sound brick provide enough strength for a standard basin. We test them mechanically after installation to confirm they will not slip under daily use.
We kill mould with a disinfectant solution before drilling and leave the wall to dry for at least two hours. If seeping continues from outside, we recommend fixing the external seal first.
