Wall position check
Marking the correct height and anchor points before any drilling

Jahra
Wall-hung basin installation in Saad Al-Abdullah City starts with marking a precise level line on the wall to keep the basin straight. We mount metal brackets into brick or block, connect supply and waste pipes, and test everything before handover.
Most homes in Saad Al-Abdullah City have spacious bathrooms with solid walls that can take heavy fixing, allowing a wall-hung basin without floor support. We check wall strength and brick depth, then choose brackets that handle the weight of ceramic, water and daily use. The modern homes have central drainage in the wall, so we measure its height and run the waste pipe at the right fall from basin to main stack.
Saad Al-Abdullah City lies in Jahra governorate, a residential district where building services are distributed in a planned and orderly way.
We test the brackets under load before hanging the basin, because modern walls need confirmation that the anchor point will hold.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We choose metal brackets of consistent thickness and fix them at different points so weight distributes evenly. A spirit level is used after installation to confirm horizontal before handover.
We first check the brick and mortar thickness. If brick is weak we use chemical anchors instead of standard bolts. Some older homes need extra metal backing inside the wall.
