Position and height
correct mounting height marked before any fixing begins

Farwaniya
Washbasin installation in Ardhiya Industrial starts by checking existing water lines in the warehouse or factory and locating a nearby floor drain. We position the basin based on available fall and supply access, then test flow and waste before handover.
Warehouses and factories in Ardhiya Industrial have large work areas and drains are usually set into the floor near a section entrance. We cut a narrow trench from the basin position to the floor drain and lay the waste pipe with a steady fall of at least one centimetre per metre. If the drain sits very deep, we raise the basin slightly or run the waste up a wall to avoid breaking much of the floor.
Ardhiya Industrial is in Farwaniya governorate, a zone dedicated to warehouses and factories where hand basins are usually in break rooms and offices.
Every joint is tested under continuous water pressure for five minutes before the trench is sealed with cement.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if an existing drain is close by. We run the waste pipe above the floor along a wall or metal bracket until it reaches the drain. This keeps the floor intact and makes future maintenance easier.
We cut a narrow trench from the existing water line to the basin position and extend both hot and cold supply pipes. We check pressure and flow from the main line before connecting the basin.
