Position and height
correct mounting height marked before any fixing begins

Jahra
Washbasin installation in Jahra Industrial zone, a factory area, requires alignment with large existing drainage systems. We position the basin near a collective drain. We run hot and cold supply from a nearby feed point, connect waste, and inspect pressure and full flow before handover.
Jahra Industrial factories have centralised water and drainage systems designed for heavy loads. When fitting a basin in a workshop or worker break area, we select an accessible spot near a known drain line. We check current water pressure to confirm it can feed the basin without affecting other uses. We install a robust standard trap to protect the main drainage from debris. We test the basin under full pressure with taps opened at varied rates.
Jahra Industrial is in Jahra governorate, a zone specialising in heavy and light manufacturing.
Current water pressure is measured before installation to ensure it adequately supplies the new basin.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, provided you have a nearby drain point with adequate capacity. We test the existing channel first to confirm it is not at full capacity. We connect the new basin with its own trap to the main channel without needing to alter old lines.
We inspect pressure at the nearest feed point and measure it precisely. If it is too low, we recommend installing a small booster tank or a separate pressure pump for the basin. This ensures steady flow throughout the day.
