Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Capital
Epoxy tank lining in Dasma begins with complete drainage and scraping internal walls free of rust and sediment deposits. We apply primer coat then finish coat and lower an inspection camera to ensure no cracks or voids remain beneath the coating.
Many older residential buildings in Dasma have underground tanks beneath courtyards or on roofs, and their thin walls rust quickly from hard water. Epoxy coating bonds to concrete only after scraping to smooth and removing all salt and oxide, and we clean every speck of dust with high-pressure water before painting begins. If we find a fine crack we fill it with epoxy putty first, because paint alone will not seal deep voids.
Dasma lies in the capital near the old commercial centre, a dense residential area with multi-level water tanks in most buildings.
Each epoxy coat must cure for twenty-four hours before the next is applied, because internal moisture affects coating adhesion.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the old coating is flaking or lifting from the wall it must be fully removed because new epoxy will not bond to it. We test adhesion by gently raising the scraper edge on a small patch first.
Yes, walls cannot be scraped or painted with water present. We ensure all connected pipes are drained and leave the vent open throughout so walls dry completely before coating begins.
