Crack welding
direct thermal weld along each fracture line in the tank wall

Capital
Tank welding in Abdullah Al-Salem handles cracks leaking from plastic tanks mounted on villa roofs. We inspect the whole tank and locate the crack, classifying it by depth and length. We prepare the surface by grinding and cleaning, then fuse the crack with a plastic rod under controlled heat. The tank is tested under full water pressure before handover.
Most Abdullah Al-Salem villas have a red or black plastic tank on the roof that needs repair when exposed to direct sun and seasonal expansion. Fine cracks show up at mounting brackets or around the top feed outlet. We often find worn plastic fasteners and clips holding the lid. Sometimes we lift the tank from its supports to reach the crack at the right angle. After welding, we let it cool then reinstall it carefully.
Abdullah Al-Salem sits in Kuwait governorate near the British Embassy, an established villa neighbourhood with rooftop water tanks.
The weld is tested by filling the tank and inspecting the repaired spot underwater without extra pump pressure.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but the bottom bears the greatest pressure so we choose a deep weld and thicker plastic rod. After cooling we apply strong adhesive tape on the outside as extra protection.
Plastic welding needs at least two hours to cool and cure fully. We tell you when it is completely ready and you can safely refill after that.
