Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Jahra
Jahra Industrial's factory and quarry tanks need epoxy coating to withstand continuous heavy pumping and industrial dust contamination. We drain the tank quickly, clean it of metal particles and apply a thick uniform epoxy layer.
Quarry and concrete factories in Jahra Industrial pump water continuously at high pressure through large distribution tanks built from sun-exposed concrete. Industrial dust and fine sand penetrate concrete pores and accumulate on inner walls, causing small blockages in drain and vent openings. Epoxy must be thick and hard enough to withstand friction from high-pressure water particles and mineral salts.
Jahra Industrial is a factory zone in Jahra governorate, where large tanks serve heavy continuous operations around the clock.
We test coating hardness after seven days by scoring the surface with a cutting tool because high-pressure pumping may scratch weak enamel.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Epoxy protects tank walls from erosion and cracking caused by particles, but does not filter them. To remove sand from water, install a mechanical filter on the inlet line before the tank.
Every three to five years depending on pump intensity and water quality. If water is very hard or saline, recoating may be needed after just three years.
