Crack welding
direct thermal weld along each fracture line in the tank wall

Farwaniya
In Rai Industrial, large rooftop tanks supplying offices and warehouses endure severe mechanical stress from heavy pipes connected to them. Repairing the welds on these tanks requires complete drainage, pressure-testing under one thousand litres per hour, then welding the crack with reinforced metal rod.
Rai Industrial buildings are relatively modern with fibreglass and heavy-gauge plastic tanks mounted on concrete pads. Near The Avenues complex, tanks take high flow because the buildings use heavy water and pipe pressure increases wall crack risk. On site we inspect tank mounting on the pad first, because pump vibration causes branching cracks. If cracking stems from loose mounting we fix the metal anchor bolts and roller feet before welding the wall.
Rai Industrial lies in Farwaniya governorate, an industrial-commercial zone where multi-storey buildings have massive tanks operating under high pressure.
At each inspection we record leak rate in millilitres per minute to track whether the crack grows under repeated pressure.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we drain the tank completely and the pump cannot run during repair. The work usually takes four hours including drying and testing, so we work night shifts or weekends when usage drops.
We weld each crack separately with full cooling intervals between them. We pressure-test each one before moving to the next because rushed welding weakens quality.