العربية Call now

Farwaniya

Tank welding in Rai Industrial

In Rai Industrial, large rooftop tanks supplying offices and warehouses endure severe mechanical stress from heavy pipes connected to them. Repairing the welds on these tanks requires complete drainage, pressure-testing under one thousand litres per hour, then welding the crack with reinforced metal rod.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Rai Industrial buildings are relatively modern with fibreglass and heavy-gauge plastic tanks mounted on concrete pads. Near The Avenues complex, tanks take high flow because the buildings use heavy water and pipe pressure increases wall crack risk. On site we inspect tank mounting on the pad first, because pump vibration causes branching cracks. If cracking stems from loose mounting we fix the metal anchor bolts and roller feet before welding the wall.

Rai Industrial lies in Farwaniya governorate, an industrial-commercial zone where multi-storey buildings have massive tanks operating under high pressure.

At each inspection we record leak rate in millilitres per minute to track whether the crack grows under repeated pressure.

What the service covers

Crack welding

direct thermal weld along each fracture line in the tank wall

Joint repair

re-welding inlet and outlet fittings where the flange joint has failed

Fibreglass patching

resin-and-mat layer over the damaged zone before the final weld seal

Seal verification

internal camera after welding reveals any weak point before refilling

Hatch replacement

replacing the tank lid when the leak source is the cover seal

Post-work report

written record of weld locations and camera inspection result

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Tank welding

Back to Tank welding

Other services in Rai Industrial

Common questions

Questions about Tank welding in Rai Industrial

Need someone now? The emergency line is open any hour.
+965 9668 4964

Must the building stop using water while the tank is being repaired?

Yes, we drain the tank completely and the pump cannot run during repair. The work usually takes four hours including drying and testing, so we work night shifts or weekends when usage drops.

What if there is more than one crack in the tank?

We weld each crack separately with full cooling intervals between them. We pressure-test each one before moving to the next because rushed welding weakens quality.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp