Crack welding
direct thermal weld along each fracture line in the tank wall

Farwaniya
Tank welding in Ardhiya Industrial fixes cracks and leaks in plastic and fibreglass tanks serving factories and workshops. We inspect the full tank, locate the break, drain the water, prepare the surface and weld it at controlled heat for a complete seal.
Tanks in Ardhiya Industrial bear high pressure because continuous production needs steady flow, and a cracked tank stops work and may damage the surrounding floor. We trace the leak under pressure before heating, because heat can alter how the crack runs. Most industrial tanks are deep and heavy, so we need strong drainage and bracing while welding.
Ardhiya Industrial sits in Farwaniya governorate, a factory and workshop zone where operations depend on tanks that hold steady and do not leak.
Every weld is tested by filling the tank and holding it under full pressure for six hours before handover.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, supply and waste lines must be isolated and the tank completely drained first. This protects machines from hot water and fumes, and lets us inspect the full surface and apply heat safely.
Cracks near openings need extra care because the metal there is thinner and weaker. We prepare carefully around the opening and widen it slightly if needed to apply even heat without damaging the rim.
