Crack welding
direct thermal weld along each fracture line in the tank wall

Jahra
Tank welding in Sulaibiya Agricultural addresses failures of massive tanks installed to supply water to fields and livestock year-round. We test distribution lines and drains under pressure, then weld cracked joints, lubricate metal fittings and test the secondary outlet before restart.
Farms and animal pens near Sulaibiya Agricultural centre use fibreglass tanks exceeding ten thousand litres, with submerged pumps and buried distribution lines. Constant pump pressure and seasonal demand swings stress the welds at joint heads, especially around cleaning and drain ports. We measure tank wall thickness from outside with ultrasonic kit before welding, because fibreglass loses strength gradually under ultraviolet light.
Sulaibiya Agricultural in Jahra is a zone of fields, farms and poultry operations where large tanks run continuously through the season.
Every weld is tested by high-pressure pumping and pressure monitoring for nine hours because agricultural tanks cannot tolerate slow leaks.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Upper joints can be welded with partial water if cracks sit at least thirty centimetres above the current water level. Underwater cracks require full drainage because moisture weakens thermal weld quality.
Three times: each individual weld with electric pressure test, then the full tank with real pump flow for six hours, and finally twenty-four hours after restart to confirm weld stability.
