Crack welding
direct thermal weld along each fracture line in the tank wall

Jahra
Tank welding in Sulaibiya Industrial strengthens tanks used in manufacturing, washing and cooling against leaks and sudden failure. We inspect connection pipes to heavy machinery, clean weld heads of salt and oxide, weld cracks with localized heat transfer and industrial pressure test before handover.
Factories and plants in Sulaibiya Industrial zone near the main Jahra road install multiple metal and plastic tanks of varying sizes connected by heavy pipes on workshop roof structures. Metal tanks corrode internally if water is acidic or carries heavy metals, and cracks appear at vibration points from heavy machinery. We sample the water before welding to determine acidity and expected corrosion, because welding alone is useless if water will eat the walls from inside.
Sulaibiya Industrial zone in Jahra houses factories, labs and processing plants where large tanks withstand high pressures.
After welding, every tank is pressure tested at fifty-one pascals for ten minutes because factories require strict safety standards.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Welding seals external leaks only and does not stop internal rust. We recommend a corrosion-resistant internal coating after welding if water is acidic or contains sulphates.
Cracks up to fifteen centimetres can be welded if they run straight and do not branch. Intersecting or branching cracks indicate structural fatigue and require tank replacement.
