New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Jahra
In Sulaibiya Industrial, water pipe installation must handle high flow and steady supply for production and cooling processes. We lay a network of varying diameters from storage tanks or central pumps across workshops and warehouses with heavy-duty supports. We pressure-test each branch and document every joint before production starts.
Factories and warehouses in Sulaibiya Industrial need large-diameter pipes with multi-point distribution, and old pipes often clog with sediment or rust needing flush or replacement. We remove damaged runs and lay copper one-inch or larger based on process size, fixing them to a sturdy steel frame with supports every 1.5 metres. We flush every line with high-pressure water before final connection and test flow and pressure from each outlet using a meter.
Sulaibiya Industrial Area in Jahra governorate holds factories and warehouses needing reliable water supply with steady flow.
Every new pipe network is tested at 8 bar for at least two hours with crew on-site checking each joint.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a high-pressure water pump to target each blocked section point by point and reverse direction several times to break the deposit. Then we meter the flow to confirm return to normal rate before reconnecting.
Yes, if possible, because hot pipes expand more and need flexible supports and separate maintenance access. We divide lines with clear isolation valves and label each main branch red for hot and blue for cold.