Roof-tank pump
Transfers water from ground tank to roof tank reliably.

Jahra
Installing high-pressure pumps in Sulaibiya Industrial serves small factories and processing plants. We pick a centrifugal pump with power matching the required flow and final pressure. We mount the motor on a bolt-down base with vibration dampers and fit a pressure gauge on the discharge line for continuous monitoring.
Factories and workshops in Industrial Sulaibiya need steady-pressure water for production and cooling. Industrial pumps run on heavy electric motors needing a dedicated power line and proper earthing. We flush the pipework inside after fitting because sediment from old wells cuts output. The surge tank must be stainless steel if the water undergoes any chemical treatment.
Sulaibiya Industrial in Jahra governorate holds workshops and small factories relying on private well water.
We check industrial pump flow against a steady pressure curve for two hours before handing it over for continuous operation.
Transfers water from ground tank to roof tank reliably.
Keeps hot water at the tap without a long wait.
Sets correct cut-in and cut-out points, stops short-cycling.
Evacuates cesspits efficiently with a non-return valve fitted.
Lifts sewage from low-level units to the drainage network.
Protects basements from water accumulation via float-activated switch.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we always fit a relief valve set below the pipe's maximum pressure rating. If pressure spikes the valve opens and dumps excess water to a sump.
At least every three months we check the motor bearings and seals for leaks. Heavy motors need regular oiling and oil moisture tests.
