Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Jaber Al-Ali requires checking structural beams and load-bearing columns before choosing where the base sits. We work with the building engineer to find the best load point. Then we connect hot and cold water pipes, drain and overflow lines, and test for leaks under live pressure.
Homes in Jaber Al-Ali vary from light to heavy construction, and some have roofs with columns and beams close together, limiting tank space. We check every column and beam for weakness or cracks before fixing. Fill and overflow pipes sometimes run long paths, and we may need suspended runs if there is no gutter on the roof.
Jaber Al-Ali is a residential zone in Ahmadi where medium family homes mix with larger villas.
We test every pipe by pumping water through it at full flow before connecting to the main supply.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We consult the structural engineer first to assess safe load limits. We may suggest splitting storage across two smaller tanks or using a tall narrow tank on multiple legs to spread weight.
Thermal insulation is not our work, but we leave space around the tank for natural air flow and heat reduction. If you want insulation, we assist with board placement so access ports and vents are not covered.