Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Ahmadi begins with hoisting the tank to the roof and positioning it clear of ventilation stacks and existing pipework. We set it on a level concrete base, run supply and waste and overflow lines, fill the tank and check every joint under full pressure.
Ahmadi houses are mostly two or three storeys with wide flat roofs and good clearance between old pipes. This means positioning the tank here is easier than in other areas, because we can place it where it won't block air to the cooling units or stress weak ceiling frames. Before hoisting we measure the slab thickness and concrete depth to ensure the new base will sit flush without voids under the tank.
Ahmadi is a historic governorate centred on Kuwait Oil Company headquarters, where most houses were built in phases with similar roof designs.
Tank connections are tested under full water pressure for one hour before handover to verify no leaks at welds or joints.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only with caution if the edge has a strong parapet and is away from roof drains. We first test the parapet strength, as a full tank weighs tonnes and wind pressure can add stress.
We pour a new concrete base with variable thickness under the tank to level it perfectly. This ensures even weight distribution and prevents the tank from shifting or tilting on a sloped surface.
