العربية Call now

Farwaniya

Underground tank construction in Ardhiya Industrial

Underground tank construction in Ardhiya Industrial starts with raking the foundation soil and compacting the base, then excavating a trench for reinforced concrete walls. Steel setting and formwork takes a week, and after pouring we wait for cure, strip the forms and pressure-test the shell before backfill.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Large factories and warehouses in this area need deep tanks with high capacity, and the soil is sandy mixed with fine gravel which aids digging but means groundwater management during work. We measure water levels before excavation and set up dewatering pumps where needed, and monitor pit walls to prevent collapse while formwork is built. Tanks here are often linked by supply pipes from a central borehole or main line.

Ardhiya Industrial sits in Farwaniya governorate, a zone packed with large factories and warehouses that rely on sizeable underground tanks for supply.

Each tank is tested full under hydrostatic pressure for 24 hours because even one leak can disrupt factory operations.

What the job covers

Site and depth planning

Position and depth chosen to suit the transfer pump and surface loads

Walls and base construction

Base and walls built to carry soil pressure and full water load

Full waterproof lining

Internal and external coating layers that block water movement in both directions

Pipe entry points

Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks

Pump and float connection

Transfer pump and water-level float wired and adjusted for correct operation

Tightness test

Tank filled and water level watched to confirm zero leakage before backfilling

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Underground tank construction

Back to Underground tank construction

Other services in Ardhiya Industrial

Common questions

Questions about Underground tank construction in Ardhiya Industrial

Need someone now? The emergency line is open any hour.
+965 9668 4964

How do you manage high groundwater in the tank pit?

We measure groundwater level before start and install temporary dewatering pumps around the pit. After concrete has fully cured we stop the pumps and complete backfill in balanced layers.

Does a poured concrete tank need an extra waterproof coating?

Reinforced concrete walls provide strong sealing if the mix is right and poured without voids. We test it under pressure, and if needed we apply epoxy coating to the inner surface before putting it into service.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp