Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
An underground tank in Dabaiya starts with site survey and deep excavation in southern Ahmadi soil. We build tank walls from reinforced concrete, apply tight waterproofing to all surfaces and full-pressure water test before delivery.
Dabaiya households and farms need tanks for waste water and rare rainwater overflow. The soil here is sandy with light clay layers, requiring moderate excavation effort. We test the soil first and set excavation depth by the layers we find, building walls thick enough for that depth. All walls and base get cement and bituminous waterproofing together.
Dabaiya sits in southern Ahmadi governorate, a small residential and agricultural area with mixed soil types.
Water level is measured hourly for six hours after the tank is filled because slow drops reveal hidden leaks.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We look for a spot away from existing wells, building foundations and large trees. We take small soil samples first to understand the layers before starting main excavation.
Yes, clay gives better wall stability but holds moisture around the tank. We add drainage pipes through clay layers and apply extra outer wall waterproofing.