Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Jaber Al-Ahmad City requires careful assessment of new concrete structure before fixing. We select position by available load capacity, run distribution lines through concealed chasing and finish with full pressure testing.
Modern residential buildings in Jaber Al-Ahmad have precisely designed roofs with water collection and drainage ducts. The tank must sit on a thin concrete pad to spread its weight over a larger area. We scan the slab thickness before final placement and run supply and distribution lines straight with heat insulation throughout.
Jaber Al-Ahmad City in Kuwait governorate is a modern residential development scheme with very high building standards.
All tank openings and seals are inspected before first fill to ensure no leaks occur.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but concrete quality and reinforcement must be checked first. We measure allowable deflection and select a proper weight-distribution base to prevent slab cracking.
We raise the tank slightly on extended bases to clear existing pipes. Where rerouting is needed, new pipes are laid with steady fall and joined with flexible connectors.