Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Sabahiya requires first assessing roof strength and the space between residential units. We lift the tank and secure it on a matrix of concrete supports. We connect the feed line carefully, fit an overflow valve and drain pipe, then run a full pressure test.
Sabahiya apartment buildings often have connected roofs, meaning a tank may serve two or more units. We check ownership boundaries on the roof before choosing location, and install separate drop pipes for each unit so each resident controls their own pressure. Where the roof is thin we use steel supports instead of concrete to reduce weight.
Sabahiya is a residential district in Ahmadi governorate with many apartment blocks where centralised roof-mounted water storage is a common and necessary solution.
Before handover the tank is filled completely, overflow is monitored and each drop pipe is tested individually at full flow.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a pump with filters between the street line and the tank to push water uphill steadily. The pump runs automatically when tank level drops and stops when full using the float valve.
Yes, if the roof is strong enough. Both tanks share one feed line but each needs its own base and separate drain. We pressure-test and flow-check all pipes after connection.
