Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Mangaf requires a thorough roof survey first, as many older houses here have thin slab foundations. We measure natural slope, test pipes beneath the tank, build a strong base, fill the tank and inspect it fully.
Mangaf houses were built over decades with varying roof slab thickness and strength, some with narrow drainage channels just below the surface. Before fitting the tank we map all pipes and channels underneath and relocate weak pipes if we find fissures between them and the new tank position. We choose the tank position close to the roof's highest point to shorten waste lines.
Mangaf is a residential district in Ahmadi governorate near Mangaf Co-op, with houses of mixed sizes and levels.
We fill the tank slowly then watch the concrete base for two hours to check for new cracks under the load.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure slab thickness and visible condition first by eye and gauge. If it is weak we suggest splitting water across two smaller tanks or adding timber props under the roof to distribute load.
We plot their position on the roof and leave them if clear of the new base. If they sit directly under the tank position we disconnect them and route their outlets through new pipes around the base.