Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Jahra
An underground tank in Naeem starts with removing mixed sandy and clay soil and preparing the pit floor. We build concrete walls at suitable thickness, seal the tank with complete bitumen insulation and pressure-test it.
Naeem houses are a mix of old and new villas on mixed-soil ground. The soil there combines sand and clay, making excavation easier than pure clay zones but requiring careful base levelling. We test the floor after digging and lay fine sand and graded gravel under the foundation concrete to distribute load evenly.
Naeem is a mid-range residential area in Jahra governorate with mixed soil and moderate building density.
We measure soil density with a proctor test before deciding concrete foundation thickness.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, because soil parts settle at different rates. We test the soil first then lay a uniform sand and gravel base under the tank to prevent uneven settlement or wall cracking.
We fill the tank completely and monitor it for eight consecutive hours, checking every joint for leaks. If it passes we drain it and let it dry before final connection to house pipes.