Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Farwaniya
Roof tank installation in Omariya starts with a site visit and agreement with the family on tank size based on occupancy and storeys. We transport the tank to the roof, build a levelling base, connect the main feed from the street and the waste to the sump, then test pressure under full load.
Omariya houses are detached or semi-detached with private courtyards and relatively low roofs with old absorption wells. The distance from the street to the roof can be a hundred metres, so we check the pipe length needed and pressure drop along that run. We use a larger pipe diameter if the length exceeds fifty metres. Tank waste goes to the existing well in the back yard at a steady fall without sharp bends.
Omariya lies in Farwaniya governorate, a suburban district of villas and family homes spread around the Omariya Co-op.
We measure actual pressure drop with a manometer from the discharge point to the tank inlet before and after filling to document real performance.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We dig a new absorption well near the back yard or connect to the municipal sewerage if available. We test soil permeability at the new location before construction.
Yes, briefly while we cut the main pipe at the meter and fit the diverter valve and tank inlet. We ensure the valve works freely before water is restored.
