العربية Call now

Farwaniya

Roof tank installation in Khitan Al-Jadida

Roof tank installation in Khitan Al-Jadida starts with checking roof structure and load limits. We position the tank and set it on concrete base, run supply from the meter and overflow to the stand pipe, then pressure-test each joint before completion.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Most Khitan Al-Jadida houses are simple residential buildings with flat, accessible roofs. The tank usually goes in a corner away from air-con units and aerials. We measure from the main meter beside the building and choose the shortest rising pipe route, because every extra metre loses pressure. We check that overflow drains away from the walls and does not puddle on the roof.

Khitan Al-Jadida lies in Farwaniya governorate, a small residential suburb of orderly family homes where roof tank installation is a standard practice.

The full tank is tested by monitoring pressure at every connection point for five minutes to confirm there is no weeping.

What the installation covers

Tank installation

Mounting the tank on a level concrete base to protect its base from cracking

Inlet and supply lines

Running the fill line and distribution line to floors in PPR pipe

Overflow and drain line

Installing the overflow at correct slope so no water pools on the roof

Pump connection

Connecting the existing transfer or pressure pump and setting its switch

Float valve fitting

Fitting a brass float valve sized to the tank for accurate fill cut-off

Pressure test

Testing all joints under pressure before handover to confirm no leaks

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Roof tank installation

Back to Roof tank installation

Other services in Khitan Al-Jadida

Common questions

Questions about Roof tank installation in Khitan Al-Jadida

Need someone now? The emergency line is open any hour.
+965 9668 4964

How high must the tank be to give enough pressure for the flat?

We need at least two-and-a-half metres height from the tank bottom to the highest tap in the building. We measure from the top floor drain and position the tank to give this difference, or water will dribble at the upper bathroom shower.

What if the building roof is too tight for a large tank?

We choose a narrower tank of suitable volume or split the load between two smaller tanks side by side. We ensure the concrete base under each tank is thick enough to spread the weight across the roof.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp