Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Farwaniya
Roof tank installation in Rabiya starts by checking modern deep concrete slabs. We position the tank on main load-bearing walls, run supply and waste pipes at steady fall, then fill and test pressure before completion.
Rabiya is a relatively modern residential area with family houses of contemporary design and thick insulated concrete slabs with wool. Buildings sit in small gardens with private pathways and roofs are usually clear with no obstructions. Supply comes from a new underground tank under the yard or a modern main meter near the house, and waste runs straight down a vertical pipe to a new ground trap or soakpit. Pipe fall is easily tested across the full section because walls and supports are regular and strong.
Rabiya in Farwaniya is an updated residential zone near parks and schools where ground level is higher and drainage runs fast.
Pipe joints are checked with a short-term pressure gauge because modern houses have strict leak standards.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, modern slabs in Rabiya are designed with large safety margins. We place the tank directly on the strongest section over the main load-bearing walls.
The vent pipe rises only thirty centimetres above the tank and ends with a small cap. We place it at a rear corner of the roof away from the street where possible.
