Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Sawaber begins by hoisting the tank to the tall roof of a multi-storey residential tower. We choose a position that minimises the supply line length to units and set supports, then test pressure under full load.
Tall Sawaber residential towers need tanks on very tight roofs beside other heavy equipment. We plan the tank position precisely to reduce the length of the main riser carrying water to all floors. Very long vertical runs may need a booster pump or intermediate tank if roof pressure alone cannot serve both top and bottom units equally.
Sawaber is a dense residential zone in Kuwait City where the Al Sawaber Complex holds many tall towers built close together.
We measure pressure at the tower's highest point to confirm water reaches the twentieth floor and above with adequate force.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if the tank sits high enough and stays full, but top-floor units may feel pressure drop at peak use. If pressure is weak, we add a booster pump at the tower base or install an intermediate tank at mid-height.
Yes, we fit drain valves at line ends to remove sediment from the heavy water falling from roof height. Every six months these should be opened briefly to flush deposits before they clog taps on lower floors.
