Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
Underground tank construction in Shuaiba deals with light sandy soil and high coastal moisture. We excavate with strong side bracing, pour an elevated foundation to avoid groundwater seepage, insulate walls with thick polyethylene sheet, and fill-test the tank for extended periods before delivery.
Shuaiba is an industrial and residential coastal zone south of Ahmadi with oil refineries, maintenance workshops and worker housing near Shuaiba Port. The soil here is very light sand close to sea-water table level, making deep excavation difficult and waterproofing critical. We test sand density by measuring compaction resistance and set foundation height above groundwater level with at least one metre of dry soil above tank base.
Shuaiba lies in Ahmadi governorate on the industrial coast, an area where underground tanks face high groundwater pressure and sea-salt corrosion.
Groundwater level is tested weekly for a month before excavation starts because live coastal sand raises the water table during high tide.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Because the groundwater table is very high on the coast and may reach two metres below surface in certain seasons. Raising the tank base ensures it does not submerge in salty groundwater that corrodes concrete.
Polyethylene protects concrete from water, but we add an extra epoxy coating to the internal wall surface to prevent salt penetration through hairline cracks.