Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Shuwaikh begins by checking the roof structure and measuring load capacity. We position the tank away from the edge, run supply and overflow lines, and test pressure before handover.
Mixed residential and commercial buildings in Shuwaikh need tanks of varying sizes, and many older roofs have uneven partition walls. We calculate discharge from the tank to lower units based on roof height and storey count, and ensure vertical copper pipes are insulated from heat. Before first fill, all joints are tested under 1.5 bar pressure for 10 minutes.
Shuwaikh lies in Kuwait governorate near Shuwaikh Port, a mixed zone of warehouses, residential blocks and commercial shops.
The roof is inspected with the owner before order because some roofs need concrete reinforcement.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
After seating the tank on its concrete pad we fill slowly and watch the base and surrounding floor for an hour. If any moisture appears we drain, retighten bolts and reseal.
At least two metres from any edge to avoid wind sway and allow safe maintenance access. We mark the perimeter with a light barrier or tape.
