Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Underground tank construction in Shuwaikh starts with assessing groundwater level and the dense sand soil near Shuwaikh warehouses. We excavate to a safe depth, build reinforced concrete walls of uniform thickness and seal the floor and roof completely. Supply and overflow pipes are connected, all joints tested, then the pit is backfilled.
The commercial and industrial area of Shuwaikh holds warehouses and workshops that need underground tanks to store desalinated or reclaimed water before treatment. The soil here is sandy with gravel layers, meaning deeper excavation and stronger tank walls against lateral pressure. We monitor the water table because it can rise in winter, so we raise the roof level or add an extra overflow opening.
Shuwaikh sits on the Gulf coast near Shuwaikh Port and the Kuwait Science Museum, a commercial investment zone where underground tanks serve ongoing daily operations.
Every tank is tested by pumping water under full pressure and monitoring the level for two hours to confirm no leakage.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We raise the tank roof above the expected water level or install an automatic float-switch sump pump. This protects the structure from upward pressure and cracking.
Not unless we design the roof with thicker concrete and internal bracing. We discuss expected loads with you before construction to ensure proper design.