Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Jahra
Water tank installation in South Jahra begins by measuring the roof and checking available electrical load before hoisting the tank. We size it for the household, run supply and waste pipes, install the pump and test full pressure.
South Jahra houses are older with flat concrete roofs that easily bear tank weight, though underground pipes are sometimes narrow or fractured. We install the pump beside the main inlet on the ground and run new pipe inside brick walls up to the roof tank. We check the fall from tank to foundation drain before commissioning.
South Jahra is a residential suburb in Jahra governorate where families rely on roof tanks for storage and water pressure.
Every pump fitting and riser is tested under pressure before tank fill because roof leaks are difficult to repair later.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure concrete depth first and calculate the load based on tank size. If the slab is thin, we distribute weight on timber or steel bearing plates that transfer load to the load-bearing walls.
Yes, the pump draws from the well line and lifts water to the roof tank. We install a meter and non-return valve before the pump and a pressure gauge on the rising main.
