Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Farwaniya
An underground tank for a villa in Abdullah Mubarak requires deep excavation under the yard, wall formation and complete waterproofing. We pour a sloped concrete base, connect supply and outlet pipes and run an overnight monitored fill test.
Homes in Abdullah Mubarak sit near the Sixth Ring Road with spacious yards suited to large underground tanks. The soil here is sandy and needs good drainage before construction begins because seepage around the tank puts pressure on walls. We raise ground level with a properly sloped sand layer, then set wooden formwork for walls with high precision and position pipe sleeves before pouring concrete.
Abdullah Mubarak sits in Farwaniya near the Sixth Ring Road, an area of spacious villas with contemporary layouts.
Tank drainage is tested after first fill using gravity alone without a pump to confirm pipes have the correct fall.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
A flexible cement coating brushed on all interior surfaces, followed by a density-graduated plastic membrane with a protective sand layer on the outer face.
We separate the drainage line by at least one meter from tank walls and use sealed sewerage pipes with compression couplings underground.