Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Underground tank construction in Bnaid Al-Qar requires special attention to coastal climate and salt exposure affecting concrete durability. We excavate carefully given high groundwater, build with salt-resistant concrete and thick waterproofing, then test pump and drain before handover.
In Bnaid Al-Qar near the beachfront and old airport road, soil is permanently wet and groundwater is high in salt. We dig as deep as groundwater allows and build walls in extra-thick salt-treated reinforced concrete. Base drain pipes protect against saline groundwater pooling, and multi-layer cement waterproofing shields concrete from salt weathering both from air and soil.
Bnaid Al-Qar is in Kuwait governorate beside the beachfront, a coastal district where salt corrosion affects the lifespan of underground tanks.
We specify high-cement concrete with anti-salt additives because Bnaid Al-Qar groundwater has standard high salinity levels for the coastline.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, salt penetrates standard concrete and corrodes internal rebar within a few years. We use specialized concrete with salt-resistant additives and rebar with protective coating applied.
Every year we inspect the outer waterproofing and drain water pooled around the tank base. If hairline cracks appear we inject cement immediately before salt penetrates deeper.
