Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
Underground tank construction in Shuaiba Industrial starts with deep excavation beside production units on flat ground. We choose a location away from main pipelines, build thick concrete walls and seal them completely with waterproofing before connection.
Shuaiba's factories need large underground tanks to store fresh water or treated wastewater for reuse in cooling and processes. The soil here is sandy with rock layers at certain depths, so we excavate carefully and test wall stability before pouring the base. A well-sealed tank stops water seeping into surrounding soil and keeps the stored liquid clean.
Shuaiba Industrial sits in Ahmadi governorate near the KIPIC petrochemical complex, where every production unit needs reliable storage tanks.
Before handover, the tank is filled with water and pressure monitored for eight hours to ensure no leakage occurs.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We pour concrete at calculated thickness based on depth and diameter, and place dense steel reinforcement before pouring. After curing, walls are tested under gradual pressure before sealing.
We drill carefully into the rock with proper equipment and remove sharp edges. A smooth concrete base is poured on the rock before wall construction begins.