Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Dasman begins with assessing the seafront villa structure, roof load and pipe routing from the main supply. We position the tank away from the roof edge on a level concrete pad, then connect the inlet, emergency overflow and float sensor.
Dasman seafront villas have level roofs and solid stone walls that bear the weight of a full tank. We lose natural pressure because the roof sits so high above outlet points, so we test water flow at every fixed tap after filling and running. Where the villa is multi-storey, we route the overflow pipe safely away from neighbouring properties.
Dasman sits on the eastern seafront of Kuwait City, a villa district where roof tops are the natural place for large storage tanks.
We test the float and overflow together under full pressure because any leak here shows fast on an exposed roof.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We inspect the concrete and walls first by measuring thickness and assessing any sag. If strong enough we build a load-distribution pad, otherwise we consult an engineer before proceeding.
We bolt the tank to a wide concrete base with heavy anchor bolts under the body. Where the roof is open with no walls we add metal bracing on the sides for extra stability.