العربية Call now

Ahmadi

Underground tank construction in Sabahiya

Building an underground tank in Sabahiya requires deep excavation because the residential area is dense with villas and modern houses. Concrete walls are reinforced with tied rebar, the roof is sealed with tar and sand, service pipes are connected and pressure testing is completed before use.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Sabahiya is a modern residential area in Ahmadi governorate with medium-sized villas and low-rise apartment blocks near Sabahiya Co-op. Each household needs an underground tank because the public water network cannot maintain sufficient pressure throughout the day. We calculate the lateral pressure on tank walls before work starts because compacted sand around the excavation increases horizontal load on concrete walls.

Sabahiya lies in Ahmadi governorate, an orderly residential area where most underground tanks are built beneath villa front gardens.

Soil stability is tested by sampling three points around the excavation site before digging because unstable sand causes trench-wall collapse.

What the job covers

Site and depth planning

Position and depth chosen to suit the transfer pump and surface loads

Walls and base construction

Base and walls built to carry soil pressure and full water load

Full waterproof lining

Internal and external coating layers that block water movement in both directions

Pipe entry points

Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks

Pump and float connection

Transfer pump and water-level float wired and adjusted for correct operation

Tightness test

Tank filled and water level watched to confirm zero leakage before backfilling

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Underground tank construction

Back to Underground tank construction

Other services in Sabahiya

Common questions

Questions about Underground tank construction in Sabahiya

Need someone now? The emergency line is open any hour.
+965 9668 4964

Can the tank be dug beneath the villa front garden?

Yes, but we first check the depth of any tree roots and the location of underground electricity and gas lines. Deep excavation may need timber shoring to support trench sides during construction.

What thickness should tank walls be in a dense residential area?

We calculate it based on tank depth, water pressure and surrounding soil load. In Sabahiya with typical depth, we use thirty-centimetre concrete thickness with rebar mesh of twelve-millimetre diameter.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp