Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
Building an underground tank in Sabahiya requires deep excavation because the residential area is dense with villas and modern houses. Concrete walls are reinforced with tied rebar, the roof is sealed with tar and sand, service pipes are connected and pressure testing is completed before use.
Sabahiya is a modern residential area in Ahmadi governorate with medium-sized villas and low-rise apartment blocks near Sabahiya Co-op. Each household needs an underground tank because the public water network cannot maintain sufficient pressure throughout the day. We calculate the lateral pressure on tank walls before work starts because compacted sand around the excavation increases horizontal load on concrete walls.
Sabahiya lies in Ahmadi governorate, an orderly residential area where most underground tanks are built beneath villa front gardens.
Soil stability is tested by sampling three points around the excavation site before digging because unstable sand causes trench-wall collapse.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we first check the depth of any tree roots and the location of underground electricity and gas lines. Deep excavation may need timber shoring to support trench sides during construction.
We calculate it based on tank depth, water pressure and surrounding soil load. In Sabahiya with typical depth, we use thirty-centimetre concrete thickness with rebar mesh of twelve-millimetre diameter.
