Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Underground tank construction in Yarmouk requires deep excavation beneath a safe yard area away from foundations. We erect the concrete structure to high standards and waterproof all interior water-exposed surfaces. Final connection to house lines happens carefully with comprehensive testing before operation.
Plots near جمعية اليرموك التعاونية are modern family homes with wide side yards providing adequate tank space. The soil here is mixed with patchy fractured rock near surface. We excavate carefully through broken rock and place a thick concrete foundation before building the tank to avoid later settling.
Yarmouk sits in Kuwait governorate and is a historic residential area adjacent to Yarmouk Sports Club on one side.
After filling the tank with water we inspect every seam and seal for moisture or leakage before closing the excavation area.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We excavate through it carefully with proper tools and remove loose fragments. Then we place a thick concrete base layer that equalizes pressure and prevents tank settling.
After successful pressure testing and complete concrete curing, typically after ten days. We backfill the excavation with compacted layers of sand, gravel and original soil.
