Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Ahmadi
A proper municipal sewer connection at Zour links drainage pipes from the power station to the public grid with minimal delay. We inspect everything on video and record the test before final handover and closure.
The power generation station at Zour demands heavy drainage from cooling systems, cleaning and daily operations, so connection pipes carry variable flow throughout the day. We choose high-capacity pipes and larger diameter and place inspection chambers at close intervals to distribute pressure. We record sewer depth from the engineering map and dig precisely under the ground around the station without disrupting operations.
Zour sits in Ahmadi governorate, where the power station runs under heavy drainage load that needs a strong connection to the city grid.
Every inspection chamber we test by measuring water flow and monitoring descent speed to confirm the fall is steady and causes no blockage.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we choose diameter and depth to handle peak flow without flooding. Inspection chambers act as pressure relief points and can hold excess water if needed.
Hot water cools as it passes through pipes, but if temperature is very high we choose insulated pipes or extend the drainage route to allow cooling before reaching the public grid.
