Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Farwaniya
Bathroom rough-in in Ardhiya Industrial buildings starts with a clear distribution plan before concrete pours. We run hot and cold supply and waste beneath the slab, securing every joint before walls close. Air pressure testing ensures no leaks from any fitting under heavy foot traffic. The result is a system that needs no maintenance during the factory's working life.
Industrial buildings in Ardhiya Warehouses have multi-stall worker bathrooms with plain concrete floors and metal ceilings. Each bathroom needs its own water supply line and separate waste because daily use pressure is heavy. We fit galvanised pipes from the roof tank and pressure-test every branch at 10 bar before covering. We measure the fall from the first outlet to the main collection line to prevent water pooling beneath the slab.
Ardhiya Industrial lies in Farwaniya governorate, a factory and warehouse zone where thick concrete floors demand a specific routing method.
Every supply line is tested with waste pipes fully isolated because even small tap leaks accumulate under dense concrete.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but the tank must be sized for peak flow. We count the taps and showers and run each branch from the tank with even fall to ensure equal pressure at all points.
Every joint is pressure-tested at 10 bar before covering. We use high-grade galvanised pipe and bronze fittings that resist corrosion from heavy-use water. After sealing, each bathroom runs at full flow for 15 minutes.
