Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Farwaniya
First-fix plumbing and electrical in Ardhiya Industrial starts with the building plan and supply routes from the main riser. We lay cold, hot and waste water pipes alongside electrical conduits in wall channels before concrete and tiles close them in. Every route is pressure and current tested before walls seal.
Industrial buildings in Ardhiya usually have concrete floors and high walls needing strong distributed pipework to handle heavy work loads. We run main supply lines under the floor with distribution points in each section for water and waste. Electrical conduits must be separate and at least 15 centimetres from water pipes to avoid interference. We inspect every joint before concrete pour and confirm pipes are clipped to walls with heavy metal brackets.
Ardhiya Industrial sits in Farwaniya governorate, a district of warehouses and production sites needing robust drainage and distribution systems.
We pressure-test all pipework at 6 bar for one hour before walls close to ensure every joint is sound.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We divide the wall path into separate zones: pipes at the bottom and electrical conduits at the top, with at least 15 centimetres clearance between them. Every route is drawn on the execution plan before work starts.
We test pipes under pressure first to check for leaks, then electrical circuits with an ohmmeter 24 hours after routing is complete. Actual power is not run until the contractor confirms walls are dry and secure.