Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Farwaniya
Apartment first-fix in Ishbiliya starts by reviewing building plans and checking concrete column directions. We install supply pipes from the main meter and position vertical waste runs in designated voids. Each bathroom requires floor level and available drain slope to be checked. We test pressure and flow at every point before handing over the site for later phases.
Most Ishbiliya apartments near Ishbiliya Co-op include three and four-bedroom units with open living areas. Foundations are deep and ceilings are conventional, giving good space for vertical and horizontal pipe runs. We fit outlets in the kitchen, main bathroom and second bathroom where present. Every waste branch is tested with live water to measure flow rate and stability before final handover.
Ishbiliya sits in Farwaniya governorate, a family district where projects focus on three and four-bedroom residential apartments.
Every supply line is held at steady pressure for one hour to detect leaks before walls are sealed.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the fall along the waste route. If floor slope is sufficient we run pipes naturally, otherwise we raise the outlet position with a bend or adjust the gully height.
Usually three: kitchen tap, main bathroom tap and shower. The hot line comes from the roof tank heater and is thermally insulated in cold sections.
