Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Farwaniya
Piping and electrical routing in Ishbiliya starts with a site walk with the engineer and excavation contractor to mark pressure and drainage lines. We fix roof tank height and booster pump location before installing any pipes. Every route is documented in photos and drawings, and testing happens under real pressure before handover. Electrics are completely separated from water in dedicated ducts.
Ishbiliya villas are usually two storeys with a garden, meaning the lift line from well to roof tank runs on an outer wall or inside a north column. We choose the pump route so it does not cut through the main room, and test pressure right after tank connection. Drainage lines slope toward the pit at least 2 centimetres per metre, and electrics run separately with moisture protection.
Ishbiliya sits in Farwaniya governorate near جمعية إشبيلية التعاونية, a villa zone where independent pressure and drainage systems are standard.
Every line is tested by gradually raising pressure to 15 bar and holding it for 30 minutes with no gauge drop.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We first measure pump electrical load and roof load capacity, then choose a location near the house's vertical entry to shorten the supply line. The tank must sit at least one metre above the highest fixture.
Pressure test gradually raises pressure and monitors drop over 30 minutes. Leak test runs the line under full flow and checks each joint by sight and sound. Both are needed before backfill and closure.