Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Farwaniya
Drain setup at correct falls in Ishbiliya starts by raising waste lines above slab level before pouring concrete. We mount vent outlets on roofs and place cleanout traps at design-specified positions. Each line is filled under pressure for at least one hour.
Ishbiliya houses are often two-storey with a master bathroom upstairs and guest bathroom down, meaning waste lines drop from different heights to a single stack. We calculate fall from each point separately and ensure total fall does not exceed three centimetres per metre to prevent solids from settling in the pipe. A cleanout trap where lines meet simplifies later blockage inspection.
Ishbiliya is a residential neighbourhood in Farwaniya with similar family clusters where most houses are two-storey with standard layouts.
We test simultaneous flow from upper and lower bathrooms because combined pressure reveals any weak joints under the slab.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we choose the junction point away from any floor trap directly below. We use an angled fitting to reduce sudden bending that disrupts flow.
Because blockages often form where lines meet as solids accumulate. A cleanout trap lets us insert a probe or rod without tearing up the floor.
