Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Mubarak Al-Kabeer
Apartment first-fix in Sabhan Industrial differs from residential; it focuses on high-pressure water supplies and heavy-duty drainage. We run large-diameter main pipes from the meter chamber and secure them on brackets at heights allowing inspection and maintenance. Every joint in steel pipework is tested at 10 bar pressure before handover.
Warehouses and factories in Sabhan need multiple drainage points in the floor because industrial processes generate continuous flow. We install large commercial floor drains and set deep metal grilles to catch debris. Horizontal waste pipes below the slab are placed on a rigid base and encased in chemical-resistant concrete. We check every waste pipe section's fall before pouring because any reverse slope will cause blockage later.
Sabhan Industrial is located in Mubarak Al-Kabeer governorate, a zone dedicated to warehouses and heavy manufacturing.
Heavy drain lines are tested by gradually raising pressure to 10 bar because sudden shock might fracture weak welds.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a grease and heavy-metal separator before the main drain line. The separator traps contaminants in a separate chamber cleaned regularly, while clean water flows to the public drain.
Plastic is sufficient if water temperature stays below 60 degrees Celsius. But if drainage is hot or contains solvents we use steel or copper pipes with insulating sleeves.
