Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Mubarak Al-Kabeer
Kitchen first fix in Sabhan Industrial differs because buildings are factories and warehouses with secondary kitchens for staff. We run supply, waste and vent lines to industrial code standards and secure them to steel or concrete walls. Every run must be accessible for inspection and maintenance.
Sabhan factories and workshops do not allow pipes buried in walls above a certain safe level because of inspection and safety codes. We run them on the surface with strong metal brackets, keeping clear distance from water and heat from industrial machinery. Waste pipes need a steeper, more consistent fall because industrial staff kitchens discharge large volumes at set times.
Sabhan Industrial is in Mubarak Al-Kabeer governorate, a warehouse and factory zone with strict codes for all internal utilities.
We pressure test and flow-test under full industrial kitchen load because any leak on production equipment stops operations.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Industrial codes require all vital utilities to be visible and easily accessible for regular inspection and fast repair. Pipes inside walls make leak location and repair hard without halting production.
Yes, usually one or two sizes larger because the load is heavier and discharge happens at peak times. We calculate expected volume and choose bore size to prevent blockage and backflow.
