Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Ahmadi
Drain-line foundation work in Shuaiba Industrial begins just before the concrete pour. We lay waste runs from each collection point and connect floor inlets, grease traps and vent stacks. Lines are sloped at steady fall toward main inspection chambers. Every joint is air-tested under pressure before the runs are buried under the slab.
Industrial facilities in Shuaiba have multiple waste sources: labs, canteens, automated washbays all in one building. We measure distances from each point to the main chamber and plot the fall so each branch stands independent. Vent pipes go on the roof later but we install metal sleeves in the slab to pierce the roof frame. Where the workshop floor sits low we add extra floor traps so no single run exceeds fifteen metres.
Shuaiba Industrial sits in Ahmadi governorate, an industrial zone of factories and treatment plants where the law requires drain lines to be pressure-tested before commissioning.
We log air pressure and test duration on every branch because the site inspector requires the certificate before the slab is closed.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, only canteens and hot washbays need one. We connect other sources straight to the main drain if they are clean waste. One trap can serve two nearby sources if they carry equal load.
We excavate at the nearest chamber, isolate the leaking section and re-test it. But pre-pour air testing stops this happening, because we fix every joint before it vanishes under concrete.