Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Ahmadi
Kitchen first-fix in Shuaiba Industrial prioritises thermal insulation and corrosion-resistant materials. Hot and cold runs pass through thick steel walls and are shielded from industrial heat. The waste line is tested to ensure it withstands salt and steam exposure. Every point is logged in the project record.
Industrial canteens and staff kitchens in Shuaiba near the petrochemical complex face harsh conditions of heat, humidity and salt spray. We use stainless steel or reinforced PEX instead of standard copper. Thermal wrap around hot supply is essential to prevent heat loss and condensation. Waste is set at adequate fall in the shortest run to the central water-treatment system. Every joint is pressure and leak-tested before handover to staff.
Shuaiba Industrial in Ahmadi governorate sits beside the Kuwait Petrochemical Industries Company complex, a heavily industrialised work zone with major facilities.
All metal joints are tested at 15 bar to withstand over-pressure from industrial heat conditions.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Salt air and steam accelerate oxidation and pitting in copper. Stainless steel lasts longer and resists corrosion even in harsh industrial conditions.
Wrap adds a small upfront cost but saves energy loss and maintenance later. In industrial kitchens it is essential for stable water temperature.
