Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Ahmadi
First-fix plumbing and electrical work in Shuaiba Industrial starts right after foundation concrete sets and walls rise. We run water, waste, gas pipes and power distribution cables through planned floor and wall chases. Each route is tested for pressure and insulation before any final wall covering closes.
Shuaiba factories need deep floor voids for oversized waste lines and multiple heavy-load electrical runs. We set collection points for pipes near machinery rooms and production halls, running each line by the shortest route to cut pressure drop and loss. High-pressure testing is essential because water or power failure stops production for hours.
Shuaiba Industrial sits in Ahmadi governorate and hosts the KIPIC petrochemical complex alongside many other specialized factories.
All pipes are pressure-tested at 10 bar for one hour because a slow leak in a factory means undetected water loss for weeks.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We size the pipe diameter by expected flow rate and install non-return valves at collection points. Full drainage is tested under simulated peak consumption pressure before walls close.
Yes, we mark access locations in the plan before pouring and install plastic inspection chambers at bends and junctions. They are temporarily covered until construction finishes.