PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Jahra
Flexible PEX networks in Jahra Industrial supply hundreds of factories with reliable water from thick main lines. We start from central supply points and distribute pipes across workshop roofs, manufacturing plants and underground ducts. We test pressure and flow, install insulation and valves. Handover includes documentation specifying pipe diameters, every tap location and tested pressure values.
Jahra Industrial factories are diverse and need different water flows based on their work, from metal washing to cooling and blending. We inspect each factory separately to understand peak demand and design the network with diameters matching the load. Main pipes from the meter are thickest, branches reduce in diameter according to demand. We install a pressure gauge at each main distribution point to monitor pressure, and advise opening water slowly after handover because sudden pressure shocks damage pipes and equipment.
Jahra Industrial sits in Jahra governorate as a dense manufacturing zone where multi-storey factories and high pressure, high-flow demand are standard.
Factory networks are tested at 2.5 megapascals for at least three hours before any equipment runs.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, laundry and cleaning plants need high flow so we use larger diameters than a chemical mixing plant. We calculate peak expected demand and choose the diameter that keeps velocity between 1.5 and 2 metres per second to avoid noise and pressure loss.
We install a check valve right after the meter to protect the network from backflow of contaminated water. We also fit a pressure-reducing valve at each main distribution point, so if water stops in one branch the other valves maintain pressure across the rest of the network.
